DOCUMENT APPROVAL
|
Prepared by: |
|
|
|
J. Eric Grove |
|
10 May 2006 |
|
J. Eric Grove |
|
Date |
|
Approved by: |
|
|
|
Paul V. Dizon |
|
10 May 2006 |
|
Paul V. |
|
Date |
|
James Ampe |
|
10 May 2006 |
|
James Ampe |
|
Date |
|
Naresh Virmani |
|
10 May 2006 |
|
Naresh Virmani |
|
Date |
|
William C. Raynor |
|
10 May 2006 |
|
William C. Raynor |
|
Date |
|
W. Neil Johnson |
|
10 May 2006 |
|
W. Neil Johnson |
|
Date |
LAT Acceptance
|
Dick Horn |
|
10 May 2006 |
|
Dick Horn |
|
Date |
|
Pat Hascall |
|
10 May 2006 |
|
Pat Hascall |
|
Date |
|
Elliott Bloom |
|
10 May 2006 |
|
Elliott Bloom |
|
Date |
|
Darren Marsh |
|
10 May 2006 |
|
Darren Marsh |
|
Date |
|
|
|
|
|
Other |
|
Date |
CHANGE HISTORY LOG
|
Revision |
Effective Date |
Description of
Changes |
|
01 |
|
Initial Draft |
|
02 |
02 May 2005 |
Added online configurations, Section Error! Reference
source not found. |
|
03 |
10 May 2006 |
Added Section 6, Shipping Documentation |
|
|
|
|
|
|
|
|
The purpose of this Technical Note is to document the contents of
the Acceptance Test Data Package (ATDP) for the Calorimeter (CAL)
subsystem. The contents of this document
have been coordinated between LAT Integration, Test, and Calibration
(IT&C), LAT Systems Engineering (SE), LAT Quality Assurance (QA), and the
|
Item Description: |
||
|
Identification |
Part/Drawing Number |
Serial Number |
|
|
LAT-DS-04536-01 |
102 |
|
CAL Module |
LAT-DS-00916-04 |
102 |
|
AFEE-TEM Cable Assembly |
LAT-DS-01496 |
0065, 0042, 0067, 0050 |
|
Harness Shield |
LAT-DS-03844 |
n/a |
|
Cable Support Assembly |
LAT-DS-03848 |
n/a |
|
EM2 Tower Electronics Module (TEM) |
LAT-DS-01481 |
FM06 |
|
EM2 TEM Power Supply |
LAT-DS-01482 |
FM06 |
|
MECHANICAL
SUMMARY DATA |
Mechanical Lead: Paul Dizon |
|
|
|
ITEM: |
REMARKS: |
|
|
Structural Analysis reviewed and
acceptable |
Available on file at NRL |
|
|
Structural Tests reviewed and
acceptable |
Available on file at NRL |
|
|
Open Items from tests performed or
from meetings with SLAC |
None |
|
|
Mass (Measured) |
86.148 kg |
|
|
As Run Mass Measurement Procedure |
|
|
|
Mass (Mass Survey) |
86.372 kg |
|
|
Mass / Center of Mass Report -
Analysis |
|
|
|
Dimensions |
Complies with IDD |
|
|
Interface flatness and surface finish |
Complies with IDD |
|
|
Dimension Inspection Report |
CAL FM102 Final
Inspection |
|
|
Final visual inspection prior to
shipping |
WOA-01767 (in process) |
|
ELECTRICAL
SUMMARY DATA |
Electrical Lead: James
Ampe |
|
|
|
DESCRIPTION: |
REMARKS: |
|
|
Power consumption (28V, 25 deg C,
nominal activity) |
10.08 W (WOA-01346) |
|
|
Power consumption (3.3V, 25 C,
nominal Activity) |
4.222 W |
|
|
Part List reviewed and acceptable |
Delivered to LAT at SLAC |
|
|
Electrical Test reviewed and
acceptable |
Available on file at NRL |
|
|
Open Items from previous reviews /
meetings / tests |
Complies with Requirements |
|
|
Power consumption Report |
|
|
PRODUCT
ASSURANCE DATA |
Quality Lead Engineer: Nick
Virmani |
|
|
|
DESCRIPTION: |
REMARKS: |
|
|
Non-conformance report summary |
|
|
|
Open NCRs |
None |
|
|
Traceability of unit pedigree |
On file at NRL |
|
|
Photographic Record |
On file at NRL |
|
|
Inspection records |
On file at NRL |
|
|
Storage, handling, shock records |
On file at NRL |
|
|
WOA list |
|
|
|
All operations, inspections, and
tests have been completed per procedures as indicated on WOA (signed and
dated) |
WOAs available on file at NRL |
|
|
All operations performed to released
and controlled procedures |
Procedures available on file at NRL |
|
|
Chronological history is up-to-date
and reflects each major action that has transpired |
WOAs available on file at NRL |
|
|
Identity of manufacturers, part
numbers, and serial number are correct |
Available on file at NRL |
|
|
All Problem Reports, Material Review
Board Reports, and failure reports are closed and accepted as per internal
procedures |
PRs available on file at NRL, see
list of open PRs above |
|
|
Materials and processes used in the
hardware are approved and acceptable |
Available on file at NRL |
|
|
Test logbooks, including operating
time and cycle records, are complete and meet specified requirements |
Log books and WOAs available on file
at NRL. |
|
|
All test data including deviations
have been approved and stamped by the test engineer and Quality Assurance |
WOAs and reports on file at NRL |
|
|
Inspection performed for physical
damage (such as scratches or dents) and for cleanliness |
No appreciable damage to
interfaces. Unit cleaned prior to
shipment. |
|
|
Connectors and pins examined for
evidence of damage or contamination |
No evidence of damage or
contamination. Refer to Mate/Demate Log |
|
|
All environmental test data and
results meet specifications |
Exceptions listed in non-conformance
report |
|
ENVIRONMENTAL TEST
SUMMARY DATA |
System Engineer: Lisa Gelston |
||||
|
EMI/EMC Test (Acceptance Level) |
LAT-PS-03929-03 |
||||
|
Summary Report |
|||||
|
Requirement |
LAT-SS-00778 |
Pass / Fail |
|||
|
CE102 |
Conducted Emissions, Power Leads |
Figure 12 |
Pass |
||
|
CS102 |
Conducted Susceptibility, Power Leads |
Figure 24 |
Pass |
||
|
ENVIRONMENTAL TEST
SUMMARY DATA |
System Engineer: Paul Dizon |
|||||
|
Vibration Test (Acceptance Level) |
LAT-PS-04454-03 |
|||||
|
Summary Report |
||||||
|
Requirement |
LAT-SS-00778 Criteria |
Pass / Fail |
||||
|
Random Vibration |
Table 21, Section 9.1 |
Acceptance (FM) |
Pass |
|||
|
Sinusoidal Vibration |
Table 25, Section 9.2 |
Acceptance (FM) |
Pass |
|||
|
ENVIRONMENTAL TEST
SUMMARY DATA |
System Engineer: Paul
Dizon |
|||
|
Thermal Vacuum Test (Acceptance Level) |
LAT-PS-04455-02 |
|||
|
Summary Report |
||||
|
Requirement |
LAT-SS-00778 Criteria |
Pass / Fail |
||
|
Acceptance
Temperature |
Table 30, Section
11.3 |
–20°C to +35°C (FM) |
Pass |
|
|
Survival Temperature |
Table 30, Section 11.3 |
–30°C to +50°C (QM) |
Pass |
|
|
Operational Temperature |
Table 30, Section 11.3 |
–15°C to +25°C (FM) |
n/a |
|
|
Hot Turn On (Acceptance) |
LAT-MD-00408, Sect 7.1.2.7 |
+35°C |
Pass |
|
|
Cold Turn On (Survival) |
LAT-MD-00408, Sect 7.1.2.7 |
–30°C |
Pass |
|
LAT Calorimeter Verification & Environmental Test Plan, LAT-MD-01345, summarizes the requirements and verification method contained in
LAT-SS-00018
LAT-SS-00210 CAL Design Specification
LAT-DS-00233 CAL-LAT Interface Definition Drawing
LAT-SS-00238 CAL-LAT Mech., Therm., Elec. Interface Control Doc.
LAT-SS-00778 LAT Environmental Specification
The verification status and/or data product mapping is indicated in the current release of the document:
The CAL Comprehensive Performance Test (CPT), LAT-MD-01370-02, versus test phase and associated trending analysis. This document describes the components of the CPT and the trending analyses that are provided. There current version of that document is LAT-MD-01370-02.
|
Phase |
Test |
Date |
Summary Status |
Report |
|
Initial Test |
CPT |
|
Pass |
|
|
Post EMI/EMC |
CPT |
|
Pass |
|
|
Post Vibration Test |
CPT |
|
Pass |
|
|
Post TVAC Test |
CPT |
|
Pass |
|
|
Preship Calibration |
CPT |
|
Pass |
|
|
Final Preship |
CPT |
|
Pass |
|
|
Trend Analysis |
|
n/a |
|
The CAL Comprehensive Performance Test (CPT), LAT-MD-01370-02, versus temperature
|
Phase |
Test |
Date |
Summary Status |
Report |
|
TVAC Cold |
CPT |
|
Pass |
|
|
TVAC Hot |
CPT |
|
Pass |
|
|
Trend Analysis |
|
Na |
|
The Calorimeter Assembly and Test program at NRL is well underway, and a very large set of calibration and functional test data has been collected on flight Modules FM101 through FM108. These data sets include a sequence of CPTs, LPTs, DAC calibrations, charge-injection calibrations, and muon calibrations, as well as specialized studies with the Modules in specific test configurations.
Routine analysis of the functional test and calibration data is performed by on-line scripts and off-line software (both in root and IDL). Inspection of the routine test reports and monitoring of the test and calibration runs have revealed some performance issues or idiosyncrasies that are now under ongoing study. These issues will suggest approaches to calibration and operation sequences for system testing and LAT mission operations.
The current version of the Issues list is captured in LAT-TD-05365
Calibration curves shall be provided for
all telemetry. For telemetry that is
affected by temperature, calibration curves shall be provided over
temperature. For telemetry that is
affected by vacuum, calibration curves shall be provided from vacuum test. Calibration curves based on part# are acceptable
for thermistors.
FM102 SVAC calibration was performed with calibGenCAL version v3r5.
Calibration data analysis report: FM102_calibGenCAL_summary.html
calibGenCAL description: LAT-TD-05595-01 calibGenCAL_v3_description.pdf
|
Phase |
Test |
LATTE Release |
CAL GSE Release |
|
Initial Test |
CPT |
P03-02-00 |
CTS_062204A |
|
Post EMI/EMC |
CPT |
P03-02-00 |
CTS_102804A |
|
Post Vibration Test |
CPT |
P03-02-00 |
CTS_101904A |
|
Post TVAC Test |
CPT |
P03-02-00 |
CTS_102804A |
|
Preship Calibration |
CPT |
P03-02-00 |
CTS_110604A |
|
Final Preship |
CPT |
P04-06-00 |
CAL_v1-0-10_i1-1-1 |
Link to Mate / De-mate Log: CAL FM102 Mate Demate Log
Run time Summary report: CAL_FM102_RunTimeSummary.pdf
A number of tables are used by on-line software to configure the
CAL Module. Apart from the schema, these
tables comprise the characterizations or calibrations required to configure the
The complete set of configuration and calibration tables is contained in the .zip archive FM102_OnlineFiles_050429.zip
The LAT calorimeter modules shall be shipped to